"Loading..."

Site A: 120MW, Ankara Region

Sample Site Package – Ankara Region

Ankara – Northwest Industrial Zone

1. Location Overview

  • Region: Ankara – Northwest Industrial Zone
  • Parcel Size: 110 acres
  • Status: Private ownership, zoned for industrial use
  • Coordinates: XXX / YYY

2. Power Infrastructure

  • Nearest Transmission Substation: TEİAŞ 400kV – 3.2 km distance
  • Redundancy Options: 2 x 154kV feeders within 6 km
  • Estimated Time to Energization: 18–24 months after application
  • Developer can assist in utility coordination

3. Fiber Connectivity

  • Operators: Türk Telekom (primary), Superonline (secondary)
  • Fiber Line Distance: 1.5 km from site edge
  • Latency: <30 ms to Frankfurt, <50 ms to Marseille (via terrestrial + submarine route)
  • Dark fiber option potentially available

4. Physical & Environmental Conditions

  • Topography: Mostly flat, 2–3% slope east to west
  • Elevation: ~890m
  • Environmental Status: No protected zones, ÇED pre-screening initiated
  • Water Access: Municipal source 800m away (capacity for closed-loop cooling supported)
  • Road Access: 4-lane industrial highway, 2.4 km

5. Permitting and Legal

  • Zoning: Confirmed industrial zoning
  • Permits: Construction and environment permits not yet applied
  • Estimated Permit Timeline: 6–9 months
  • Local municipality supportive of hyperscale infrastructure projects

6. Development Options

  • Transaction Models: Land sale / BTS / Joint Venture
  • Ready-for-Development Target: Q3 2026
  • Optional Services: Design consultation, EPC matchmaking, legal support
  • Exit Options: Flexible deal terms depending on anchor tenant interest

7. Maps & Visuals

  • Satellite Image: Available upon request
  • Power & Fiber Overlay Map: Provided in PDF format
  • Optional Conceptual Layout: Buildable envelope with stormwater and access routes

Let’s build the future of digital infrastructure together.

Contact US