Site B: 80 MW, Riyadh Outskirt

Sample Site Package – Riyadh Region

Riyadh – Northern Industrial Expansion Zone

1. Location Overview

  • Region: Riyadh – Northern Industrial Expansion Zone
  • Parcel Size: 120 acres
  • Status: Private ownership, designated for industrial/commercial use
  • Coordinates: XXX / YYY

2. Power Infrastructure

  • Nearest Transmission Substation: SEC 380kV – 2.8 km distance
  • Redundancy Options: 2 × 132kV feeders within 5 km (dual path available)
  • Estimated Time to Energization: 12–18 months after application
  • Developer Support: Coordination with Saudi Electricity Company (SEC) for interconnection design, approvals, and construction

3. Fiber Connectivity

  • Operators: STC (primary), Mobily (secondary), Salam (tertiary)
  • Fiber Line Distance: ~1 km from site boundary
  • Latency: <25 ms to Dubai, <45 ms to Frankfurt (via terrestrial + subsea Gulf/Med route)
  • Options: Multiple carrier entrances; dark fiber and dedicated wavelength services available

4. Physical & Environmental Conditions

  • Topography: Generally flat, <2% gradient
  • Elevation: ~620 m
  • Environmental Status: Outside protected/heritage areas; preliminary EIA screening indicates low sensitivity
  • Water Access: Municipal main 500 m away (supports low-water cooling designs); desalinated supply option via regional network
  • Road Access: 6-lane arterial industrial route, direct access within 1.2 km

5. Permitting and Legal

  • Zoning: Industrial/commercial designation confirmed
  • Permits: Building permit, environmental clearance, and SEC interconnection to be applied
  • Estimated Permit Timeline: 4–7 months (with local facilitation)
  • Government Support: Aligned with Vision 2030 digital infrastructure; potential MISA incentives

6. Development Options

  • Transaction Models: Land sale / Build-to-Suit / Joint Venture
  • Ready-for-Development Target: Q2 2026
  • Optional Services: Conceptual master planning, hyperscale design consultation, EPC partner matchmaking, regulatory liaison
  • Exit Options: Flexible terms aligned to hyperscaler pre-commitment

7. Maps & Visuals

  • Satellite Image: Available upon request
  • Power & Fiber Overlay Map: Provided in PDF format
  • Optional Conceptual Layout: Hyperscale-optimized building envelope with secured access points and stormwater plan

Let’s build the future of digital infrastructure together.